Spokane International Airport: South Pilot Ramp Rehabilitation. The Work is generally described as the rehabilitation of the South Pilot Ramp and north half of Taxiway C-2 at the Spokane International Airport. Work will include pavement and building slab demolition, excavation/embankment, subsurface drainage system,base course, asphalt paving, concrete paving, removal and replacement of pavement markings, temporary and permanent security fencing, guidance signs, edge lighting, stormwater structures, landscaping, topsoil and seeding. Engineer’s Estimate: $5.0 to $5.5 million
Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
47 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090