Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WA - Spokane International Airport: South Pilot Ramp Rehabilitation
July 3, 2016
6:14 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Spokane International Airport: South Pilot Ramp Rehabilitation. The Work is generally described as the rehabilitation of the South Pilot Ramp and north half of Taxiway C-2 at the Spokane International Airport. Work will include pavement and building slab demolition, excavation/embankment, subsurface drainage system,base course, asphalt paving, concrete paving, removal and replacement of pavement markings, temporary and permanent security fencing, guidance signs, edge lighting, stormwater structures, landscaping, topsoil and seeding. Engineer’s Estimate: $5.0 to $5.5 million
Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
47 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3044

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20091

Posts: 28325

Administrators: JOHN: 7602, John: 7090

Skip to toolbar