South Puget Sound Salmon Enhancement Group: Caillouette - Thompson Spit Trib Dam Removal. This project includes the removal and lowering of an existing dam, plugging the outlet culvert and creating a new channel and culvert crossing. The dam removal requires channel excavation upstream and large woody debris placement to stabilize the creek. The new culvert and outlet channel are tidal and requires an extensive dewatering plan to isolate the work area from the stream and tidal waters. The site has buried power, cable and a waterline which need to be temporarily relocated by the Utility Company and the utilities buried in the fill for the new culvert. SPSSEG will be responsible for obtaining environmental permits; the contractor must comply with all permit requirements. The Engineer's Estimate for the base bid contract is: $470,000
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
81 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20032
Posts: 28266
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7030