Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WA - SEATTLE: FEUERBORN DEMOLITION PROJECT
May 13, 2018
8:31 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

SEATTLE : FEUERBORN DEMOLITION PROJECT 22210 SE 214TH St, Maple Valley, WA 98038PROJECT DESCRIPTION: Project includes but is not limited to obtaining a King County Demolition Permit, the complete demolition and disposal of all structures on the property (including foundations), removal and disposal of all fencing on the west and south side of the property, removal and disposal of the mailbox on the property, removal and disposal of all concrete, asphalt, and gravel surfaces, decommissioning of the property well by a licensed driller, and the placement of 6” of mulch (hog fuel or similar) over all areas disturbed by demolition activities. ESTIMATE: $208,000 including sales tax.

Contact information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
43 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar