Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WA - Sammamish: docks and piling demolition
July 22, 2012
6:47 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

CONSTRUCTION OF SAMMAMISH LANDING PHASE I C DOCK BEACH IMPROVEMENTS. This project includes, but is not limited to, erosion control, site preparation, demolition of existing docks, removal of existing vegetation, earthwork, steel piling, fabrication and construction of two new docks, aluminum gangways, concrete abutments, gravel surfacing, logs and boulders at pocket beaches, entrance sign, mitigation work and site restoration for the Sammamish Landing Phase I C Dock Beach Improvements. Bids due 08/09

Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
107 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar