Downtown Park Building Demolition. Demolition of four existing buildings; abandon, cut and cap existing water main, gas line and power at the main or ROW; abandon and/or remove storm drainage system and sanitary sewer system; removal of hot mix asphalt, cement concrete sidewalk, curb and gutter; removal of five underground storage tanks (UST); Excavation of petroleum impacted soils at specified locations; new catch basins and storm drain pipe for site drainage; grading the site surface to finished grade as shown in the plans; and other work necessary to complete the project Prebid: 6/13 @ 1:30 pm at the former Brown Street Square Building, 7810 Brown Street, Redmond, WA Bids due 06/20
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - sign up for a FREE 30 DAY TRIAL to see more jobs you may be missing
Most Users Ever Online: 429
Currently Online:
83 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950