Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WA - Redmond: downtown park building demolition and ust removals
June 9, 2013
7:09 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Downtown Park Building Demolition. Demolition of four existing buildings; abandon, cut and cap existing water main, gas line and power at the main or ROW; abandon and/or remove storm drainage system and sanitary sewer system; removal of hot mix asphalt, cement concrete sidewalk, curb and gutter; removal of five underground storage tanks (UST); Excavation of petroleum impacted soils at specified locations; new catch basins and storm drain pipe for site drainage; grading the site surface to finished grade as shown in the plans; and other work necessary to complete the project Prebid: 6/13 @ 1:30 pm at the former Brown Street Square Building, 7810 Brown Street, Redmond, WA Bids due 06/20

Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - sign up for a FREE 30 DAY TRIAL to see more jobs you may be missing

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
83 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar