Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WA - PORT ORCHARD: DEKALB PIER IMPROVEMENTS - PHASE 2
January 17, 2016
6:44 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

PORT ORCHARD: DEKALB PIER IMPROVEMENTS - PHASE 2. The project consists of work to be performed within 191 working days from February 29, 2016, and consists of furnishing all materials, equipment, tools, labor, and other work or items incidental theretofore and as generally described as follows: DEKALB PIER IMPROVEMENTS-PHASE 2 includes removal of the existing float system including 13 timber creosote piles and gangway from the fixed pier followed by new construction. New construction includes the installation of three 90-foot long steel grated catwalks, an 80-foot long aluminum gangway, a 260-foot long float system, and electrical lines providing low level illumination extending from the existing fixed pier along the catwalks and along the entire length of the float system. The catwalk will be supported by 3 pairs of new steel piles. The floats will compliant timber and aluminum construction with anchorage provided by 14 new steel piles. WA -

Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card needed)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online: John
57 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3044

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20091

Posts: 28325

Administrators: JOHN: 7602, John: 7090

Skip to toolbar