PORT ORCHARD: DEKALB PIER IMPROVEMENTS - PHASE 2. The project consists of work to be performed within 191 working days from February 29, 2016, and consists of furnishing all materials, equipment, tools, labor, and other work or items incidental theretofore and as generally described as follows: DEKALB PIER IMPROVEMENTS-PHASE 2 includes removal of the existing float system including 13 timber creosote piles and gangway from the fixed pier followed by new construction. New construction includes the installation of three 90-foot long steel grated catwalks, an 80-foot long aluminum gangway, a 260-foot long float system, and electrical lines providing low level illumination extending from the existing fixed pier along the catwalks and along the entire length of the float system. The catwalk will be supported by 3 pairs of new steel piles. The floats will compliant timber and aluminum construction with anchorage provided by 14 new steel piles. WA -
Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card needed)
Most Users Ever Online: 429
Currently Online: John
57 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090