

Port of Seattle: Terminal 91 Berths 6 & 8 Redevelopment Testing & Inspection. This solicitation is for the Testing and Special Inspection work on the Terminal 91 Berth 6 & 8 Project. The project will redevelop the condemned vessel berths and adjoining apron areas of Berths 6 & 8 along the northeast side of Pier 90 at Terminal 91 to help ensure the long-term viability of the Port of Seattle as the home to the North Pacific fishing fleet. Planned redevelopment includes demolition of the existing timber apron; seawall improvements; removal and relocation of existing gangways, floats and boathouse; removal/replacement of existing small office structures; geotechnical ground improvement; and construction of a concrete apron structure along the current alignment
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
85 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3054
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20211
Posts: 28445
Newest Members:
Tiannuo, RBC Logistics, Ed Etefia, Midwest Steel, Brett Palme JrAdministrators: JOHN: 7602, John: 7210