

Port of Everett: Central Marina Fuel Dock Reconstruction. This project includes the reconstruction of the Port of Everett's floating fuel dock. Work includes, but is not limited to: demolition and disposal of existing floating docks; extracting and disposal of creosote treated timber piles; design, fabrication, and delivery of a new approximately 500-foot long floating concrete dock; furnishing and installing galvanized steel pipe piles; constructing two on-float timber framed buildings; furnishing and installation of a new fuel system including re-purposing of existing fuel dispensers; furnishing and installing water and sanitary sewer systems; furnishing and installing electrical and communications systems including power pedestals, light poles, and service to the two on-float building structures; and all other Work as shown and as specified for a complete and operable facility. ESTIMATED COST:$7,000,000 - $8,700,000 (incl. WSST)
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online: John
36 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3054
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20211
Posts: 28445
Newest Members:
Tiannuo, RBC Logistics, Ed Etefia, Midwest Steel, Brett Palme JrAdministrators: JOHN: 7602, John: 7210