Tumwater Creek Bridge Replacement. West of South Tumwater Street and north of West Marine Drive, in the City of Port Angeles, Washington. Work shall include: removing existing timber bridges, piling, sheet piling, and other creosote treated timber and replacing them with a precast concrete bridge with sheet pile abutment, cast in place pile cap, and steel pipe piling, reconstruction of rip rap slopes, Bids due 07/19
Find complete details to this bid and more nationwide at envirobidnet.com click on link below FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
79 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20032
Posts: 28266
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7030