Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WA - Point Defiance: Track removal and disposal off-site
May 17, 2015
8:36 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Point Defiance Bypass IFB. Track removal and disposal off-site, concrete and wood tie track construction, grading for track construction, installation of railroad subballast, shifting of existing track, relaying rail, grinding rail, undercutting track, construction of retaining walls, turnout installation, turnout removal, turnout relocation, crossover installation, grade crossing removal, installation of concrete grade crossing, resurfacing of existing concrete grade crossing, derail removal, derail installation, installation of new turnouts in existing track, installation of concrete and wood ties in existing track, installation of rail, removal of existing fence, installation of chain link and wire fence, installation of railroad signage, removal of abandoned railroad poles and overhead lines; removal of existing grade crossing warning devices and associated electrical equipment, enclosures, and foundations; installation of Centralized Traffic Control and Positive Train Control railroad signal equipment; provision of power service for signal equipment; relocation of existing grade crossing signal equipment; installation of grade crossing signal systems at Clover Creek Drive SW, North Thorne Lane SW, 41st Division Drive, and Barksdale Avenue SW.; traffic signal interconnects and grade crossing preemption; installation of new roadway traffic signals; and modifications to existing roadway traffic signals at North Thorne Lane SW, 41st Division Drive, and Barksdale Avenue SW. Remove and replace existing railroad bridge at Clover Creek (WSDOT Bridge 10.8L); Retrofit and repair existing railroad bridges at Pendleton Ave (WSDOT Bridge 16.9L), I-5 Northbound (WSDOT Bridge 19.9L), and I-5 Southbound (WSDOT Bridge 19.8L). Manhole installation, catch basin installation, installation of storm drain pipe, installation of culverts, underdrains, and track drains, installation of silt fence, check dams, inlet protection, wattles, and construction entrances, pruning of existing trees, clearing, and grubbing. Removal of roadway subgrade, pavement, sidewalks, curb and gutter, installation of roadway subgrade, curb and gutter, sidewalk, hot mix asphalt and cement concrete pavement, roadway signing and striping, and temporary traffic control. Maintenance and inspection of railroad tracks, bridges, and crossing signals within the limits, and for the duration, of the Work of this Contract. Bids due 06/23

Details to this bid & hundreds more nationwide at http://www.envirobidnet.com Free 30 Day Trial – 15% discount for DF members if you subscribe (enter codeD0246 when taking at trial to qualify)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
52 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar