Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WA - Kelso: construction of a 0.5-million-gallon (MG) welded steel standpipe water reservoir including demolition of existing elevated
July 3, 2022
8:32 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Kelso: Beacon Hill Water and Sewer District: Beacon Hill Reservoir The construction of a 0.5-million-gallon (MG) welded steel standpipe water reservoir and related site improvements including demolition of existing elevated reservoir, proposed reservoir subgrade preparation, utility piping, driveways, site fencing, site restoration, overflow pond, connection to the existing water system, and electrical/controls. The construction project also requires dewatering and temporary shoring during the subgrade excavation.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
65 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar