Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WA - Gig Harbor: timber pier demolition
June 10, 2012
8:04 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

(RFP) Construction services for the Maritime Pier, Ramp and Float Project. An existing creosote treated timber pier shall be demolished, and a new fixed timber pier supported by steel pipe piles shall be constructed, starting at the existing concrete bulkhead at the east end of the Parking Lot and extending into Gig Harbor. A new timber float, anchored with steel pipe piles, shall be installed to the east of the fixed pier. A new aluminum gangway shall be installed to provide access from the end of the fixed pier to the float. Bids due 06/20

Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
75 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar