MUKILTEO FERRY TERMINAL (PHASE 1) TANK FARM DEMOLITION AND DREDGING (CL 13, $7,500,000 - $10,000,000) F. A. No. WA-90-X580 on SR 525, MP 8.47 Vic for Washington State Ferries. Requires: demolition of the tank farm pier, dredging, traffic control and other work. 362 Working days. Involves 25 items. 21000 CY dredging & disposal, 1300 T debris removal and disposal, 1800 T capping material, 2800 CY contaminated dredged material disposal, 80 T quarry spalls, 205 LF compost sock, 250 LF high visibility fence, 260 SY const geotextile. Lump Sum Bids for: Environmental compliance lead, temp traffic control, field office bldg, marine survey, SPCC plan .Bids due 01/07/15
For details to this bid and hundreds more nationwide see: http://www.envirobidnet.com Take a free 30 day trial (no credit card required)
Most Users Ever Online: 429
Currently Online: John
26 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950