Arden Bridge Emergency Replacement. The major items of work include: Clearing and grubbing, removal of existing bridge, removal of existing fence, minor channel work, constructing gabion cribbing, construction of cast-in-place pipe piles, construction of bridge superstructure including pre-cast concrete girders, placement of crushed surfacing, placement of Hot Mix Asphalt 58-22, installation of guardrail, erosion control, traffic control and clean-up items. Bids due 08/21
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
115 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950