Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WA - Bothell, bridge demolition
June 5, 2011
6:17 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

240th Street SE Bridge Replacement over North Creek Project. The 240th Street SE Bridge Replacement over North Creek Project proposes to replace two bridges at 240th Street SE, one vehicular and one trail bridge. The general aspects of this work will involve installation/removal of falsework, grading of the creek channel behind the existing bridge abutments, the deconstruction of existing bridges, roadway reconstruction, Bids due 06/14

Find complete details to this bid and more nationwide at envirobidnet.com click on link below FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
67 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19932

Posts: 28166

Administrators: JOHN: 7602, John: 6930

Skip to toolbar