Boistfort Valley Water: Fabritank Reservoir Replacement. The work consists of constructing a 450,000-gallon stainless steel bolted reservoir including demolishing the existing Fabritank reservoir and concrete reservoir, site work, site piping, site restoration, electrical, instrumentation, and telemetry. ENGINEER’S ESTIMATE $1,400,000 TO $1,600,000
Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online: John
48 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3043
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20052
Posts: 28286
Administrators: JOHN: 7602, John: 7050