Boistfort Valley Water: Fabritank Reservoir Replacement. The work consists of constructing a 450,000-gallon stainless steel bolted reservoir including demolishing the existing Fabritank reservoir and concrete reservoir, site work, site piping, site restoration, electrical, instrumentation, and telemetry. ENGINEER’S ESTIMATE $1,400,000 TO $1,600,000
Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
115 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3034
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19852
Posts: 28086
Newest Members:
Megan Brewer, TCL Pro - https://www.tclpro.com/commercial-liquidators-chattanooga, Tao rock, anastasia sheri, Davonte MahomesAdministrators: JOHN: 7602, John: 6849