Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
WA - Bellevue: Pikes Peak Reservoir Replacement removal of the existing 1.0 million gallon
February 21, 2021
8:20 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Bellevue: Pikes Peak Reservoir Replacement. Work contemplated to be performed under this contract is as follows: Demolition and removal of the existing 1.0 million gallon (MG) welded steel Pikes Peak Reservoir. Demolition and removal of the existing Pikes Peak pump station. Construction of a partially buried 1.25 MG prestressed concrete reservoir and associated appurtenances. Construction of onsite stormwater and site improvements including a stormwater detention vault. Construction of water system improvements including site piping, vaults, back-down vault and meter vault, and associated appurtenances. Landscape plantings Site, Temporary Construction Easement and Right-of-Way restoration. The Engineer's Estimated Range is between 5.7 million and 6.2 million.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
73 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar