Bellevue: Pikes Peak Reservoir Replacement. Work contemplated to be performed under this contract is as follows: Demolition and removal of the existing 1.0 million gallon (MG) welded steel Pikes Peak Reservoir. Demolition and removal of the existing Pikes Peak pump station. Construction of a partially buried 1.25 MG prestressed concrete reservoir and associated appurtenances. Construction of onsite stormwater and site improvements including a stormwater detention vault. Construction of water system improvements including site piping, vaults, back-down vault and meter vault, and associated appurtenances. Landscape plantings Site, Temporary Construction Easement and Right-of-Way restoration. The Engineer's Estimated Range is between 5.7 million and 6.2 million.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
73 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950