Bellevue : Pikes Peak Reservoir Replacement. Work contemplated to be performed under this contract is as follows: Demolition and removal of the existing 1.0 million gallon (MG) welded steel Pikes Peak Reservoir.Demolition and removal of the existing Pikes Peak pump station.Construction of a partially buried 1.25 MG prestressed concrete reservoir and associated appurtenances.Construction of onsite stormwater and site improvements including a stormwater detention vault.Construction of water system improvements including site piping, vaults, back-down vault and meter vault, and associated appurtenances.Landscape plantings Site, Temporary Construction Easement and Right-of-Way restoration. Engineers Estimated Range is between 5.1 million and 5.6 million
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
84 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950