

Anacortes: Former Water Treatment Plant Demolition Project. This Project generally consists of demolition of inactive Water Treatment Plant (WTP) buildings and structures including the following: • Demolition of the former administration/pump room building, including structures coated with polychlorinated biphenyl (PCB) bulk product waste. • Demolition of portions of the former filtration basin, clear well, and sedimentation basin that contain PCBs or are coated with PCB bulk product waste. • Excavation and removal of PCB-impacted soils. • Processing clean concrete debris for onsite reuse. • Backfill of clearwell structure and portions of the sedimentation basin. • Grading and restoration. • Transportation and off-site disposal of all soils and wastes, including but not limited to PCB-impacted soils and PCB bulk product waste.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
55 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3054
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20211
Posts: 28445
Newest Members:
Tiannuo, RBC Logistics, Ed Etefia, Midwest Steel, Brett Palme JrAdministrators: JOHN: 7602, John: 7210