Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
Val Verde Guard Station Demolition
April 22, 2010
9:24 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

The Forest Service has a requirement for demolition and disposal of structure due to safety concerns as well as asbestos material removal. This project includes but is not limited to demolition and removal of the Val Verde Guard Station. The structural condition of the building is very poor, so extensive safety measures will be needed for the duration of the project. In addition, the building's sheet vinyl flooring contains asbestos, therefore proper removal and disposal techniques must be taken by a licensed asbestos removal company. A plan of action, prepared by an asbestos consultant licensed in the State of Colorado, shall be submitted prior to commencement of work. After the asbestos material is removed and the building is demolished, scrape and properly dispose of the top 2 inches (minimum) of topsoil and uniformly rough grade the area to a smooth surface, free from irregularity and surface changes. Seed all areas disturbed by work activities. The Contractor shall furnish all labor, equipment, supervision, transportation, supplies, and incidentals (except Government-furnished materials) to perform all work specified herein. A pre-proposal site visit will be conducted on 11 May 2010 at 1:00PM local time. Location of Pre-Bid Meeting, Monte Vista Supervisor's Office, 1803 West Hwy 160, Monte Vista, CO 81144. For additional information regarding the site, contact Matthew Figgs at 719-852-6207. The project cost estimate is between $25,000 and $100,000. Performance and Payment Bonds will be required. Davis Bacon wage rates will apply. The performance period is approximately 30 calendar days from the issuance of the Notice to Proceed (NTP).

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
117 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar