Virginia Beach: Replace Bulkheads and Docks. The demolition of two fixed piers (Barbour Hill and False Cape Landing) and the installation of fixed timber docks. Construction includes timber ice/wave screen (Barbour Hill); riprap toe protection, and placement of fill adjacent to the existing bulkheads at both sites. Work also includes installation of concrete sidewalk (Barbour Hill), additional sand fill (False Cape Landing), along with erosion and sediment control measures.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
96 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950