Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
VA - Virginia Beach: Replace Bulkheads and Docks.
June 23, 2019
8:55 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Virginia Beach: Replace Bulkheads and Docks. The demolition of two fixed piers (Barbour Hill and False Cape Landing) and the installation of fixed timber docks. Construction includes timber ice/wave screen (Barbour Hill); riprap toe protection, and placement of fill adjacent to the existing bulkheads at both sites. Work also includes installation of concrete sidewalk (Barbour Hill), additional sand fill (False Cape Landing), along with erosion and sediment control measures.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
96 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar