Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
VA - Virginia Beach pump station demolition
September 5, 2010
6:52 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Lake Edward West Pump Station #343 Replacement The work includes the construction of a new submersible pump station with control building, including all associated site improvements, piping, pumps and controls, SCADA equipment, new standby power generator, furnishing and installing all equipment and materials, manholes, gravity sewer, force main, water main, demolition and disposal of the existing pump station, bypass pumping, traffic control, pavement replacement and site restoration, and all other associated labor, equipment and materials, startup and testing, for a complete and fully operational facility. Bids due 09/14
See complete details of this bid and more nationwide at Envirobidnet (click url below) Free 30 Day Trial

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
94 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar