South Boston: Demolition - Riverdale Acquisition Project he principal work to be performed under this contract consists of, but is not limited to, the following improvements within the seven (7) identified Operable Units (OU): demolish and remove the structures and associated concrete and asphalt detailed in each of the seven (7) OUs. The OUs are in a flood plain; therefore, they are each treated as a separate project. No waste can be stockpiled prior to removal offsite, and waste cannot be intermingled between OUs
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
92 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19932
Posts: 28166
Administrators: JOHN: 7602, John: 6930