Richmond: Church Hill Tank Replacement construction of the Church Hill Tank Replacement project to provide general contracting services that include, but are not limited to replacement of the existing tank with a new 4.8 MG concrete tank, street lighting substation, and other related work. 2.0 General Information. The project duration is for 730 consecutive calendar days. The work to be done under this contract includes: 1. Construction of a new 4.8 MG Church Hill water storage tank. 2. Prestressed concrete 4.8 MG tank. 3. Altitude valve. 4. Bypass pipe and check valve. 5. Yard piping. 6. Duct banks. 7. New fence. 8. New light pole. 9. Security cameras. 10. Landscaping. 11. Site work. 12. All necessary appurtenances for a complete and operational water storage tank as shown and as specified. 13. Replacement of the Church Hill Street Lighting Substation. 14. Demolition of the existing 5.0 MG water storage tank. 15. Removal of the existing altitude valve and vault. 16. Removal of the existing altitude valve control as shown and as specified.
Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card needed)
Most Users Ever Online: 429
Currently Online:
53 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090