Northern Virginia Community College: Demolition of the ACE Building (former Tyler Building). The work includes the disconnection and removal or capping of associated utilities within the general boundaries of the existing curbs and sidewalks surrounding the structure, abatement of hazardous materials, backfilling of the remaining excavation and grading for proper drainage, and stabilization of the site with permanent grassing
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
105 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19932
Posts: 28166
Administrators: JOHN: 7602, John: 6930