Nelson County: Blue Ridge (Crozet) Tunnel Rehabilitation & Trail Project - Phase 1 The project generally includes: Construction of Blue Ridge Crozet Tunnel Rehabilitation and Trail Construction Project, Phase 1 includes the eastern trail, tunnel trail and rehabilitation of the tunnel up to the first bulkhead and eastern trailhead. This work includes the following project elements: clearing and grubbing, installation of stormwater pipe, temporary silt fencing, inlet and outlet protection, regular and borrow excavation, geotextile, installation of aggregate and asphalt concrete, steel fencing, construction signs, mobilization, pavement planing, demolition of building, construction surveying, installation of topsoil, lime, fertilizer, and seed, installation of traffic sign panels and posts, pavement line and message marking, installation of electrical conduit, construction entrance, investigational tunnel probing, tunnel construction mobilization/demobilization, grouting and rockbolt installation in tunnel, east parapet wall construction for east portal drainage, east portal ditching-outside, tunnel ditching - inside, tunnel scaling, landscaping, kiosk, entry and interpretive signage, mile posts, benches, concrete pad, and wood bollards Bids due 02/20
Find details to this bid and more you may be missing nationwide at envirobidnet.com (click below) try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
69 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950