Salt Lake Community College RRC Instructional and Administrative Bldg. Construction of a 132,627 GSF, three wing, four level Instructional and Administration Building (IAB) which shall be steel framed with brick veneer. This project shall include site development, site utilities and the demolition of the existing Administration Building. The Construction documents consist of four sets of drawings (IAB volume I and II, Existing Administration Building Demo, and Central Cooling Plant). Construction cost is estimated at $20,400,000 Bids due 12/05
Find complete details to this bid and more nationwide at envirobidnet.com click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
93 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950