Santaquin: Senior Center and School Asbestos Mitigation and Demolition The Project is described generally as follows: demolition of two existing unreinforced masonry buildings that have a physical connection via a doorway with a footprint of approximately 13,426 sq. ft. The school building to be demolished includes 3 stories, a basement, main floor and second floor, and the senior center is a single-story slab on grade construction. The project includes asbestos mitigation of identified asbestos materials, salvaging of historically significant architectural elements, hauling and disposal of materials, providing, hauling and placement of backfill material for the demolition area, and landscape replacement. There are two buildings adjacent to the project that will remain occupied and in operation throughout the projec
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
25 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950