7:21 AM
June 8, 2006
SPRINGHILL LANDSLIDE HOME DEMOLITION. The work to be performed consists of furnishing all labor, tools, materials, equipment, transportation, and services required for the demolition of eleven homes on Springhill Drive, Springhill Circle, and Barry Circle in North Salt Lake. Associated structures, such as foundations, garages, sheds, fences, retaining walls, and concrete flatwork will also be demolished, and all construction materials properly and legally disposed of. Any asbestos removal necessary will be performed by others. Planted sod will be scraped from the existing ground and buried on-site; trees and other natural features will remain Bids due 10/02
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
118 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950