North Salt Lake City: Overland Drive Realignment – Project. The work to be performed consists of furnishing all labor, tools, materials, equipment, transportation, and services required for the realignment of Overland Drive. This includes removal of 700 LF of existing roadway, abandonment of water and storm drain lines, grading of new roadway, demolition of one house and garage, construction of 700 LF of new curb and gutter, roadway, 14” PVC water line, 30” RCP storm drain line, and all appurtenant work.. Bids due 01/28
For details to this bid and hundreds more nationwide go to http://www.envirobidnet.com take a Free 30 day trial and then 15% discount for DF members if you subscribe (to qualify for discount use code D0246 when taking a trial)
Most Users Ever Online: 429
Currently Online:
72 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950