Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
UT - Murray: multiple demolitions
July 20, 2014
5:53 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Murray School District: (RFP) New District Office, Maintenance Facility, and IT/Warehouse Building. Removal of various existing structures on the current site and construction of three separate buildings with associated site development. Building consist of CMU, structural steel, steel joists and metal decking, cabinets/casework, single ply roofing, metal roofing, hollow metal frames, hollow metal doors, wood doors, aluminum storefront, metal studs, drywall, grid ceiling, various floor coverings, misc. specialty equipment, an elevator, mechanical, and electrical. Site improvements include sewer, water, storm drain, site concrete, asphalt, striping, and landscaping. Construction site is located at approximately: Commerce Drive and Vine Street (southwest corner) Murray, UT 84107 Bids due 07/31

For details to this bid and hundreds more nationwide go to, http://www.envirobidnet.com – Take a free 30 Day Trial (no cc required

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
53 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar