HERRIMAN: Jordan Valley Water Treatment Plant (WTP) Finished Water Reservoir. JVWCD is expanding the finished water storage capacity at its Jordan Valley Water Treatment Plant from 8 million gallons to 20 million gallons. The expansion will consist of one new 12.5 million gallon storage reservoir located immediately west of the existing storage reservoir. The new reservoir will utilize a completely buried, conventionally reinforced concrete design. Construction is scheduled to begin summer 2016. The Work generally includes the following: 1. A new 12.5 MG buried, reinforced concrete Finished Water Reservoir 2. Inlet Valve Vault, Drain and Underdrain Vaults 3. Reservoir inlet, outlet, underdrain, drain, overflow, and washdown piping 4. Connections to the existing 8 MG reservoir and existing yard piping 5. Utility relocations and temporary overflow piping 6. Sample pumps and piping 7. Site work, access roads, grading and landscape restoration 8. Electrical, instrumentation and controls 9. Testing, disinfection, commissioning and startup 10. Work includes demolition of existing facilities, removal and replacement of existing utilities, excavation, and earthwork associated with construction of new faciliti
Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card needed)
Most Users Ever Online: 429
Currently Online:
101 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950