Uintah Indian Irrigation Project Operation & Maintenance Co. and Uintah Basin Irrigation Co. : Bids for demolition, excavation and construction of the following project: GREY MOUNTAIN FLUME REPLACEMENT PROJECT. The project site is located on the Grey Mountain Canal, at the point where the canal crosses Antelope Creek. The site is approximately 2 miles southeast of Bridgeland, UT in Duchesne County. The site has approximate latitude and longitude coordinates of 40.14331 and -110.2102 degrees respectively.DESCRIPTION OF WORK to begin October 15, 2018:BIDDER MAY BID ON ALL OR PARTIAL ITEMS OF PROJECT AND MUST SPECIFY ITEMS BID ONThe project involves:1) Demolition, removal and disposal of the existing 3-pipe flume structure 2) Dewatering around footings, excavation and backfilling to lines and grades as shown on plans3) Construction of a new structure as shown in the plans
Contact information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
27 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950