UT DFCM: UDC Draper Prison Demolition-22427100 Project Description: Complete demolition, removal, and disposal of building structures and foundations as listed in the demolition drawings. Removal and disposal of asphalt, concrete, gravel (roads and parking), curb gutter, sidewalks, fences, gates, razor wire, and other miscellaneous site hardscapes, including underground utilities (water, sewer, storm, gas, power and telecommunications) and other items as further described by the plans and specifications. It will be the awarded contractor's responsibility to dispose of all remaining contents, including but not limited to furnishings, fixtures, equipment, and any other remaining debris left behind. Construction Cost Estimate: $14,000,000
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
68 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950