Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
UT- DFCM: UDC Draper Prison Demolition-22427100 Project Description: Complete demolition,
July 17, 2022
8:15 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

UT DFCM: UDC Draper Prison Demolition-22427100 Project Description: Complete demolition, removal, and disposal of building structures and foundations as listed in the demolition drawings. Removal and disposal of asphalt, concrete, gravel (roads and parking), curb gutter, sidewalks, fences, gates, razor wire, and other miscellaneous site hardscapes, including underground utilities (water, sewer, storm, gas, power and telecommunications) and other items as further described by the plans and specifications. It will be the awarded contractor's responsibility to dispose of all remaining contents, including but not limited to furnishings, fixtures, equipment, and any other remaining debris left behind. Construction Cost Estimate: $14,000,000

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
68 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar