Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
UT - DFCM: SPRINGVILLE FISH HATCHERY: demolition of (2) existing buildings and site preparation for a new 60' x
December 19, 2021
9:09 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

UT DFCM: SPRINGVILLE FISH HATCHERY MAINTENANCE AND STORAGE SHOP Project Description: This project includes the demolition of (2) existing buildings and site preparation for a new 60\' x 100\' pre-engineered metal building (pemb) to house a 4-bay maintenance shop, tool storage, office/kitchenette, restrooms, and storage. Site work includes a new gravel access drive with concrete aprons at each side of the building, as well as a concrete foundation/retaining wall that transitions to a stack boulder wall. Utility connections to the new pemb include those for an automatic fire sprinkler system, as well as a new gas connection to an adjacent existing building. All utilities connect to existing utilities on site except for a new sewer line to be run to N Main St.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
81 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar