

UT DFCM: SPRINGVILLE FISH HATCHERY MAINTENANCE AND STORAGE SHOP Project Description: This project includes the demolition of (2) existing buildings and site preparation for a new 60\' x 100\' pre-engineered metal building (pemb) to house a 4-bay maintenance shop, tool storage, office/kitchenette, restrooms, and storage. Site work includes a new gravel access drive with concrete aprons at each side of the building, as well as a concrete foundation/retaining wall that transitions to a stack boulder wall. Utility connections to the new pemb include those for an automatic fire sprinkler system, as well as a new gas connection to an adjacent existing building. All utilities connect to existing utilities on site except for a new sewer line to be run to N Main St.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
32 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3055
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20211
Posts: 28445
Newest Members:
Kim, Tiannuo, RBC Logistics, Ed Etefia, Midwest SteelAdministrators: JOHN: 7602, John: 7210