Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
UMASS Medical School: The project includes demolition of laboratory and office space
July 16, 2017
9:02 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

UMASS Medical School: The project includes demolition of laboratory and office space totaling approximately 20,650 square feet. Work will include the demolition of existing lab benches, gypsum board and CMU walls, ceilings, HVAC boxes and ductwork, plumbing, including acid waste, natural gas, water, compressed air and vacuum piping, electrical power devices and lights, and removal of miscellaneous items. Asbestos abatement will be required and will include asbestos tile flooring and mastic, fire-stopping material, spray applied fire proofing, pipe insulation elbows, duct sealant and fume hood panels ESTIMATED COST: $525,000

Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL no credit card required

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
72 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3044

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20091

Posts: 28325

Administrators: JOHN: 7602, John: 7090

Skip to toolbar