UMASS Medical School: The project includes demolition of laboratory and office space totaling approximately 20,650 square feet. Work will include the demolition of existing lab benches, gypsum board and CMU walls, ceilings, HVAC boxes and ductwork, plumbing, including acid waste, natural gas, water, compressed air and vacuum piping, electrical power devices and lights, and removal of miscellaneous items. Asbestos abatement will be required and will include asbestos tile flooring and mastic, fire-stopping material, spray applied fire proofing, pipe insulation elbows, duct sealant and fume hood panels ESTIMATED COST: $525,000
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL no credit card required
Most Users Ever Online: 429
Currently Online:
72 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090