West Travis Count MUD 3: Upper Carlsbad Pond Spillway Rehabilitation Project. The work generally consists of the excavation and removal of an existing large-stone weir and its adjacent stone retaining walls and wood deck bridge structure and the construction of a cast-in-place concrete spillway and bridge replacement structure. The project site is located in the Lake Pointe community in west Travis County within the Carlsbad Pond storm water control facility, which is situated approximately 200 feet north of the intersection of Carlsbad Drive and Napa Drive within the West Travis County Municipal Utility District #3
Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card needed)
Most Users Ever Online: 429
Currently Online:
60 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950