Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
TX - West Travis Count MUD 3: Upper Carlsbad Pond Spillway Rehabilitation Project.
January 3, 2016
5:29 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

West Travis Count MUD 3: Upper Carlsbad Pond Spillway Rehabilitation Project. The work generally consists of the excavation and removal of an existing large-stone weir and its adjacent stone retaining walls and wood deck bridge structure and the construction of a cast-in-place concrete spillway and bridge replacement structure. The project site is located in the Lake Pointe community in west Travis County within the Carlsbad Pond storm water control facility, which is situated approximately 200 feet north of the intersection of Carlsbad Drive and Napa Drive within the West Travis County Municipal Utility District #3

Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card needed)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
60 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar