Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
TX - Waco: Owen Lane Elevated Storage Tank Rehabilitation Project Phase 1 Demolition
October 23, 2016
5:19 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Waco: Owen Lane Elevated Storage Tank Rehabilitation Project Phase 1 Demolition. The project consists of the demolition and removal of an existing 1.5 million gallon multi-legged, steel, elevated storage tank that contains lead paint. The project also includes the partial removal of the reinforced, concrete foundation for the tank legs, hazardous waste debris handling and disposal, regulatory compliance means and methods, site protection and grading, traffic control and all miscellaneous and incidental work required to complete the project as shown on the project drawings and as specified.

Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
66 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3044

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20091

Posts: 28325

Administrators: JOHN: 7602, John: 7090

Skip to toolbar