Waco: Ritchie Road Elevated Storage Tank, New 2.0 MG Composite Elevated Storage Tank & Demolition.The project also consists of the demolition and removal of an existing 2.0 MG Steel Spheroid Elevated Tank, including the removal of the reinforced concrete foundation, and hazardous waste debris (lead) handling and disposal, regulatory compliance means and methods, site protection and grading, traffic control and all miscellaneous and incidental work required to complete the project as shown on the project drawings and as specified. Estimated Cost is $ 4.0 M.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)