University of Houston System: Chung’s Warehouse – Full Demolition. demolish a warehouse of approximately +/-73,546 square feet in accordance with the drawings and specifications prepared by Walter P. Moore, a copy of which is attached hereto and incorporated herein as EXHIBIT D. The demolition shall include, but is not limited to, all of the structure and foundation, utilities must be capped at the main source, and the site will be subsequently graded for positive drainage and seeded.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
86 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950