Subcontractors for the USDA-ARS LAB FACILITIES RENOVATION Requires demolition of 36 existing bldgs. existing paving, site utilities This will be phased construction per the drawings GC100-109. New 998 Combo Admin/Lab bldg., 997 Fly & Tick Research bldg., new 995 Maintenance Shop A bldg., new 996Maintenance Shop B bldg., new animal incinerator, new B994 Stanchion Barn bldg. and S994 Working Barn. Requires demolition of existing paving, site utilities and 36 existing bldgs. The existing buildings will have to have asbestos abatement and lead remediation prior to demolition. Some hazardous waste removal and removal & disposal of lighting ballast (PCBs). Matt slab foundations, combo of steel and PEMB structures. Lab equipment, fume hoods, washers & sterilizers,standard commercial interior finishes and accessories, Fire sprinkler systems, commercial MEP systems, earthwork & asphalt roadways, chain link fencing, landscaping and site utilities. Bid Form requires separate pricing for all buildings, sitework, demolition of existing buildings (2 separate options for certain buildings). Project is a complete renovation to the entire facility. send bids to: sabids@satpon.com
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
104 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950