San Antonio Water System : Tinker and Westover Elevated Storage Tanks Demolition Project. The Work includes, but is not necessarily limited to, the following: 1. Demolition and removal of all structures and appurtenances shown for removal in plans. 2. Salvaging of any equipment as noted in the plans. 3. Electrical and instrumentation demolition and salvaging. 4. Capping and plugging of existing utilities to the site. 5. Restoration of all sites to match the natural ground. 6. Removal and replacement of waterlines and appurtenances in cases were distributions mains are to remain in service. 7. Surface restoration will include filling excavated areas and fill with topsoil and seeded.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
73 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950