San Antonio, Remove Bridge, Remove MSW and Reconstruct Taxiway R, Package 7. The “Base Bid” consists of the demolition of the existing Taxiway R bridge on between Taxiway RC and Runway 13L-31R, demolition of the existing Taxiway R at-grade concrete pavement and approximately 420-feet x 50-feet of the existing temporary asphalt Taxiway R, to include taxiway pavement removal and removal of edge lighting temporary asphalt, removal of the existing MSW beneath the pavement, mitigation or removal of methane gas encountered, and placement and compaction of clean backfill material. Construction elements include demolition of approximately 700-feet x 75-feet of the existing concrete portion of Taxiway R and the connector to Runway 13L-31R, removal of existing MSW material, placement of clean backfill material, grading and sodding. Demolition materials will be disposed offsite.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
72 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950