Project base bid consists of removal and replacement of culverts/bridges at ten sites. Existing structures to be removed include railroad double-tank car culverts (5 sites), concrete box/span culverts (4 sites), and timber bridge, 60� span (1 site). Proposed replacement structures include concrete box culverts (8 sites), pre-fabricated buried bridge system (1 site), and pre-stressed concrete slab beam bridge, 75� span (1 site). Bridge roadway approaches will be reworked in advance of structures. Project alternate bids (3) consists of removal and replacement of culverts/bridges at three sites. Existing structures to be removed include railroad single-tank car culvert (1 site), railroad double-tank car culvert (1 site), and timber bridge, 19� span (1 site). Proposed replacement structures include concrete box culverts (1 site) and pre-fabricated buried bridge systems (2 sites). Bridge roadway approaches will be reworked in advance of structures. Bids due 12/04
For details to this bid and hundreds more nationwide see: http://www.envirobidnet.com Take a free 30 day trial (no credit card required)
Most Users Ever Online: 429
Currently Online:
84 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950