Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
TX - Multiple bridges and culverts demolition
November 9, 2014
6:52 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Project base bid consists of removal and replacement of culverts/bridges at ten sites. Existing structures to be removed include railroad double-tank car culverts (5 sites), concrete box/span culverts (4 sites), and timber bridge, 60� span (1 site). Proposed replacement structures include concrete box culverts (8 sites), pre-fabricated buried bridge system (1 site), and pre-stressed concrete slab beam bridge, 75� span (1 site). Bridge roadway approaches will be reworked in advance of structures. Project alternate bids (3) consists of removal and replacement of culverts/bridges at three sites. Existing structures to be removed include railroad single-tank car culvert (1 site), railroad double-tank car culvert (1 site), and timber bridge, 19� span (1 site). Proposed replacement structures include concrete box culverts (1 site) and pre-fabricated buried bridge systems (2 sites). Bridge roadway approaches will be reworked in advance of structures. Bids due 12/04

For details to this bid and hundreds more nationwide see: http://www.envirobidnet.com Take a free 30 day trial (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
84 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar