Hondo ISD: Hondo High School Campus Improvements Phase 2.Demolish existing AG Building, Maintenance Transportation Buildings; existing Band Hall Accessory Buildings; existing Track existing portion of Avenue H. Construct new 26,064 SF Fine Arts Building (pre-eng. mtl. bldg.), 608 SF Restroom Bldg, 1,686 SF Concessions Bldg, 4,284 SF Field House (all to be CMU/stl-framed structures); also, new Track Field, and misc. site, driveway parking improvements. Renovate existing Activity Center, consisting of adding a new lobby extension elevator, converting stage into 2 classrooms, renovating restrooms for ADA compliance. Convert existing Art Classroom into a new Science Lab Classroom.
Detailed information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
39 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090