Harris: Construction of Water Plant No. 1 Rebuild and Water Plant No. 3 Expansion for Langham Creek UD.Water Plant No. 1: The work includes demolition of two (2) ground storage tanks, four (4) hydropneumatic tanks; Water Well No. 1 foundation and casing five feet below NG; plant piping; control building and booster pumps. Construction of a 0.35 MG precast, prestressed concrete ground storage tank; two (2) 10,000 gallon hydropneumatic tanks; three (3) 600 gpm booster pumps; a new CMU control building; chemical analyzer; all related piping; foundations; electrical; instrumentation; drainage; site work and all additional items shown on the construction plans or needed for the completely functional water plant. Water Plant No. 3: The work includes construction of a 0.35 MG precast, prestressed concrete ground storage tank; a 10,000 gallon hydropneumatic tank; 800 gpm booster pump; all related piping, foundations; electrical; instrumentation; chemical analyzer; replace booster Pumps Nos. 1 - 3; site work and all additional items shown on the construction plans or needed for the completely functional water plant.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
83 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950