Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
TX - Demolition of a Belt Press Facility at Recycling Center
October 26, 2014
6:58 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Demolition of a Belt Press Facility at Recycling Center; bids for the abatement/removal of lead based paint (LBP) and partial demolition of two (2) structures located at Water Recycling Center (WRC). Following completion of abatement process, disassembly and partial demolition will be initiated. The structures measure approximately 65� X 125� that is attached to a 2nd steel structure that is approximately 90� X 200�. This also includes a 48� X 62� metal cover which connects both structures. (Technical drawing and blueprint of the structures will be provided.) The overall estimated square footage to be addressed in this project is approximately 30,000 square feet. Bids due 11/11

For details to this bid and hundreds more nationwide see: http://www.envirobidnet.com Take a free 30 day trial (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
85 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar