Finish Out of NL Locations - Computation Offices and Lab. This space will require the demo and removal including but not limited, selective demolition, walls, acoustical ceilings, fire sprinklers, fire alarm devices, ductwork, HVAC equipment, smoke detectors and lighting as shown on the drawings. The space will require new construction of interior metal fabrications, rough carpentry, penetration firestopping, joint sealants, hollow metal doors and frames, flush wood doors, door hardware, glazing, drywall, acoustical ceilings, resilient floor and base, carpeting, dry erase wall covering, acoustical blanket insulation, painting, laboratory service sittings, roller window shades, lab casework, fire protection systems, MEP systems, addressable fire alarm systems, testing, commissioning, coordination of equipment requirements with vendors as shown on the drawings. Bids due 01/17
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
61 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950