Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
TX - Cameron: GLO, Port Isabel Bilge Reclamation Facility Demolition
November 22, 2020
8:44 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Cameron: GLO, Port Isabel Bilge Reclamation Facility Demolition and Disposal. The Texas General Land Office (“GLO”) seeks a highly skilled contractor to complete thedemolition, removal, transportation, and disposal of the entire Port Isabel BilgeReclamation Facility and all associated components in Cameron County, The Facility has ten (10) above-ground tanks located insidesecondary containment of the bilge water reclamation facility. These tanks hold bilgewater, pumped up from the sump, in varying stages of decanting, separation and filtering.There is also one underground sump tank.The Project consists of the demolition, removal, transportation, and disposal of the entireFacility and all associated components in their entirety, including the excavation andremoval of concrete slab beneath the facility. The Project site is located at 250 IndustrialDrive, Port Isabel, Texas, 78578.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
47 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar