Toilet Demolition/Site Prep/Finish Work
June 3, 2009
6:39 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

Toilet Demolition/Site Prep/finish work Eldorado National Forest This contract includes demolition of toilets; removal of existing steps, handrail, and walkways; preparation of excavated holes for off-loading by a separate contractor of pre-fabricated concrete toilets; back-filling, compacting and finish grading of newly installed toilets; construction of retaining walls; minor clearing; and construction of aggregate base surfaced or asphalt concrete surfaced walkways and turnouts. The major work items include demolition and disposal of eleven (11) 2-unit concrete block toilets with concrete vaults, ten (10) 2-unit wood toilets with concrete vaults, three (3) 4-unit wood toilets with concrete vaults, concrete and wood steps, metal handrail and asphalt walkway; construction of 4,888 sq. ft. of aggregate surfaced turnouts, 1,320 sq. ft. of A/C surfaced turnouts, 875 sq. ft. of aggregate base surfaced walkway, 600 sq. ft. of asphalt concrete surfaced walkway clearing of approximately 15 trees and minor amounts of brush; construction of approximately 150 facial sq. ft. of modular concrete retaining wall, preparation of the holes for the installation of ten (10) single unit and eighteen (18) double unit pre-fabricated toilets (off-load into holes will be done by a separate contractor); backfilling, compacting and finish grading of installed toilets and vacated toilet holes. Close coordination between the toilet installer and the Forest Service shall be essential. Scheduling of toilet deliveries and site preparation shall be at the discretion of the Forest Service. Project Location This project encompasses 12 campgrounds and 1 fire lookout within the boundaries of the Eldorado National Forest, Placerville, CA The Government's estimate is: $100,000 and $250,000. Estimated date for upload of the solicitation is June 15, bid's must be received by 2pm on July 14, 2009. Estimated Start Date September 8, 2009 Technical Contact: David Jones 530-621-5248

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
66 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19932

Posts: 28166

Administrators: JOHN: 7602, John: 6930

Skip to toolbar